Emirate Garden City Installation in Al Ain, UAE

New OpeMed Installation in the UAE.

OpeMed are pleased to have worked with the Cambridge Medical and Rehabilitation Centre early this year. Their newly built facilities lies in the quiet outskirts of the city – Al Ain, providing the ideal location for rehabilitation and recuperation.

Hydrotherapy is an effective form of rehabilitation that covers Post injury rehabilitation, Muscle strengthening and Blood circulation improvement.

Cambridge Medical & Rehabilitation Center

CMRC Al Ain Facility

These brand new facilities include the unique gravity charging OT200 Ceiling Hoist. The perfect choice to ensure seamless entry into the pool and ideal for those without full mobility.  Working to ensure the full solution, we also supplied multiple electric height adjustable changing tables to the changing rooms to allow residents to change with dignity.

If you have a project you would like to discuss, please fee free to contact us on 01252 758 858 or email info@opemed.net.

designing-disabled-access-to-swimming-pools

Designing Disabled Access to Swimming Pools

At OpeMed we work hard to ensure you have all the tools you might need to choose the right equipment for your project. To read our design tips for disabled access to swimming pools, please click below.

How to Design for a Disabled Access Swimming Pool