Ceiling Hoist Pre-Installation Requirements
OpeMed manufacture and install ceiling hoists globally, to ensure a smooth and cost effective installation we require a Pre-Installation form is completed.
This covers such topics as is the room vacant, is the roof-space clear (at time of install), if a new build and we need access to the structure is the building at the correct build-stage etc etc.
Please download and complete the Form, emailing to info@opemed.net / Fax 0870 1619681.
Any questions please contact info@opemed.net or your Sales Manager.
